Please use this identifier to cite or link to this item: http://197.159.135.214/jspui/handle/123456789/1352
Full metadata record
DC FieldValueLanguage
dc.contributor.authorAmega, Kokou-
dc.contributor.authorMoumouni, Yacouba-
dc.contributor.authorLare, Yendoube-
dc.contributor.authorBhandari, Ramchandra-
dc.contributor.authorTakouda, Pidename-
dc.contributor.authorMadougou, Saidou-
dc.date.accessioned2026-08-12T14:09:42Z-
dc.date.available2026-08-12T14:09:42Z-
dc.date.issued2024-06-12-
dc.identifier.urihttp://197.159.135.214/jspui/handle/123456789/1352-
dc.descriptionA Publication submitted to the West African Science Service Centre on Climate Change and Adapted Land Use and the Université Abdou Moumouni, Niger in partial fulfillment of the requirements for the degree of Master of Science Degree in Climate Change and Energyen_US
dc.description.abstractMost developing countries’ electric power system is stressed by an unprecedented demand growth as well as obstacles that call for urgent actions. Therefore, tackling the present-day power-related challenges and ensure dependable and safe electricity may result in improving living conditions. This research aims to comprehend the primary factors that impede power companies in emerging economies and propose ways of addressing them with a focus on Togolese electricity system as a case study., The methodology utilized to study a complex and dynamic system like electricity sector is an integrated model composed of a survey and review of available literature, an interview with energy experts and the SWOT/PESTLE analysis to perform an in-depth and allencompassing analysis. The study revealed that the electrification poverty was 39.47 % at countrywide level that requires an additional power of 220.95 MW to that of 2021 to achieve 100 % of electricity access by 2030. Moreover, the system’s performance is hindered by a number of internal and external bottlenecks. They include but not limited to limitations in policies and regulations; technical difficulties in the transmission, distribution and off-grid subsystems; insufficient investments; and a lack of incentives and taxes rebates. In light of these findings, a model prioritizing a resilient power system was proposed for transforming the outdated power infrastructure in developing countries laying stress upon energy mix planning, transmission and distribution subsectors innovation and effective regional collaboration.en_US
dc.description.sponsorshipThe Federal Ministry of Research, Technology and Space (BMFTR)en_US
dc.language.isoenen_US
dc.publisherWASCALen_US
dc.subjectSWOT/PESTLEen_US
dc.subjectPower systemen_US
dc.subjectTransformationen_US
dc.subjectReliabilityen_US
dc.subjectResiliencyen_US
dc.subjectTogoen_US
dc.titlePower system transformation in emerging countries: A SWOT/ PESTLE analysis approach towards resiliency and reliabilityen_US
dc.typeArticleen_US
Appears in Collections:Climate Change and Energy

Files in This Item:
File Description SizeFormat 
Power system transformation in emerging countries A SWOT.pdfPublication3.59 MBAdobe PDFView/Open


Items in WASCAL Scholar are protected by copyright, with all rights reserved, unless otherwise indicated.