WASCAL Academia Repository

H2 Production Potential by Dark Fermentation of MSW (Municipal Solid Waste) in Sao Vicente Island: Techno-Economic Analysis

Show simple item record

dc.contributor.author Sousa dos Reis Dias, Danielson Daniel
dc.date.accessioned 2024-03-25T10:25:40Z
dc.date.available 2024-03-25T10:25:40Z
dc.date.issued 2023-09-26
dc.identifier.uri http://197.159.135.214/jspui/handle/123456789/774
dc.description A Thesis submitted to the West African Science Service Centre on Climate Change and Adapted Land Use, the Université de Lomé, Togo, and the Universität Rostock in partial fulfillment of the requirements for the International Master Program in Renewable Energy and Green Hydrogen (Bioenergy/Biofuels & Green Hydrogen Technology) en_US
dc.description.abstract In 2016, global solid waste reached 2.01 billion tons, with projections indicating a substantial increase in the absence of change. For island communities like Sao Vicente, the scarcity of land and sustainable waste management exacerbates the issue, leading to waste dumping and burning. This project proposes a waste-to-energy approach, utilizing dark fermentation to convert the Organic Fraction of Municipal Solid Waste into hydrogen. The project's initial steps involved waste composition analysis to determine the organic waste volume contributing to hydrogen production. Daily hydrogen and byproduct estimates were then calculated. A cost-benefit analysis was conducted, evaluating annual costs, benefits, and project feasibility using indicators like Net Present Value (NPV), Interest Rate of Return (IRR), Benefit Cost Ratio (B/C), and Payback Period (PP), and lastly a break-even analysis. Additionally, carbon dioxide emissions reduction was estimated using a Greenhouse Gas Emissions Estimation Tool. The project processes approximately 2.1 tons of organic waste daily, yielding 201.47 m3 of hydrogen, 368.29 kg of CO2, 795.66 kg of acids, and 188.46 kg of slurry. The annual cost falls within the range of similar projects, around $194,266.62 USD. Revenue is generated through the sale of CO2, slurry, and H2, the last with a levelized cost of $2.64 USD, lower than the market price for biohydrogen production cost. The NPV is positive at $1,381,443.18 USD, IRR at 29%, B/C at 1.5, and PP at 8.19 years, indicating project viability. To break even, 351,773.71 units must be sold within 8 years, including 309,560.87 m3 of hydrogen, 35,177.37 kg of CO2, and 7,035.47 kg of slurry. This approach reduces monthly emissions by 17%, making it environmentally beneficial despite limited hydrogen data availability. en_US
dc.description.sponsorship The Federal Ministry of Education and Research (BMBF) en_US
dc.language.iso en en_US
dc.publisher WASCAL en_US
dc.subject Dark Fermentation en_US
dc.subject Organic Fraction of Municipal Solid Waste en_US
dc.subject Hydrogen en_US
dc.subject Cost-benefit Analysis en_US
dc.subject CO2 Savings en_US
dc.title H2 Production Potential by Dark Fermentation of MSW (Municipal Solid Waste) in Sao Vicente Island: Techno-Economic Analysis en_US
dc.type Thesis en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search WASCAL Academia


Browse

My Account